Costs and pricing
Part of Budgeting for studio equipment across its whole life, quotes and VAT included
A blank studio equipment budget template with VAT and labour tabs
A blank studio-equipment budget template for England with evidence fields, VAT treatment, labour units, control gates, tolerances and safe stop rules.
What to take away
- The blank studio equipment budget template with VAT and labour tabs has eight tabs. The core five are Read me, Header, Cost register, VAT and Labour; Scenarios, Control gates and Totals and approval follow.
- Copy the blank field lists below into a controlled workbook. Keep every value cell empty until dated evidence exists.
- Define one production workflow and one acceptance unit before the first figure goes in.
- Separate gross cash, recoverable VAT and net economic cost. A qualified tax reviewer approves the actual treatment.
- Enter contractor status from contract facts about control and responsibilities, not from an invoice or job title.
- Vary one traceable input at a time in scenarios. Show both changes if numerator and denominator move together.
- Pause the budget when tolerance is breached, a quotation expires or a mandatory gate stays unresolved.
Template tabs and header fields
Build the workbook in Microsoft Excel, Google Sheets or LibreOffice Calc. Google Sheets is free with a Google account. LibreOffice Calc is free and open source. Excel comes with a Microsoft 365 subscription, typically £5 to £11 per user each month in the UK as of 2026.
Give the workbook an owner, a version, an approval ceiling and a review date. Store evidence outside the public draft if it holds personal or commercially sensitive data. The template is not an England price benchmark.
| Tab | Blank fields to create |
|---|---|
| Read me | budget owner, version, approval ceiling, review date, evidence location, scope statement, rollback route |
| Header | project, England location, legal buyer, budget owner, delivery owner, decision horizon, output denominator, GBP currency, VAT basis, accounting period, version, last update |
| Cost register | item, quantity and unit, GBP basis, period, evidence, scope, control |
| VAT | supplier, invoice date, invoice reference, net GBP, VAT GBP, gross GBP, rate applied, recoverability, recoverable VAT, irrecoverable VAT, evidence, reviewer |
| Labour | task, role, worker reference, contract type, planned hours, approved hours, actual hours, loaded GBP rate, rate period, employer costs included, output units, approver |
| Scenarios | case, changed input, old value, new value, effect on cash, effect on unit cost, evidence |
| Control gates | gate, owner, evidence required, status, date cleared, tolerance, reforecast trigger |
| Totals and approval | committed cash, full economic cost, GBP per accepted unit, variance, remaining contingency, unresolved evidence, sign-off |
Read me tab, blank header row:
| budget owner | version | approval ceiling | review date | evidence location | scope statement | rollback route |
|---|---|---|---|---|---|---|
Header tab, blank header row:
| project | England location | legal buyer | budget owner | delivery owner | decision horizon | output denominator | GBP currency | VAT basis | accounting period | version | last update |
|---|---|---|---|---|---|---|---|---|---|---|---|
Define accepted output precisely: the technical, rights and accessibility checks that a recording must pass before it counts in the denominator.
Cost register
Field / Required entry
- item
- exact product, plan, task or risk allowance
- quantity and unit
- devices, users, hours, months or another defined unit
- GBP basis
- amount including or excluding VAT, with recoverability stated
- period
- payment date and service or use period
- evidence
- quotation, invoice, payroll record, contract or labelled scenario
- scope
- inclusions, exclusions, dependency and confidence
- control
- owner, approval status, tolerance and reforecast trigger
Cost register tab, blank header row:
| item | quantity and unit | GBP basis | period | evidence | scope | control |
|---|---|---|---|---|---|---|
Group the cash lines. Acquisition and installation stand apart from production labour. Software, storage and premises take their own rows, as do utilities, insurance and accessibility. Safety, privacy and security need separate lines. So do rights and training. Maintenance, correction, downtime and exit take lines too.
A zero requires evidence or an explicit assumption; it must not mean forgotten.
Cost Register Required Fields
- itemexact product, plan, task or risk
- quantity and unitdevices, users, hours, months
- GBP basisincluding or excluding VAT
- periodpayment date and service period
- evidencequotation, invoice, payroll record, contract
- scopeinclusions, exclusions, dependency and confidence
- controlowner, approval status, tolerance, reforecast trigger
VAT tab and labour tab
The VAT tab holds one row per purchase invoice. Its blank header row, ready to copy:
| supplier | invoice date | invoice reference | net GBP | VAT GBP | gross GBP | rate applied | recoverability | recoverable VAT | irrecoverable VAT | evidence | reviewer |
|---|---|---|---|---|---|---|---|---|---|---|---|
Pick the rate from 20% standard, 5% reduced, 0% zero-rated, exempt or outside the scope. Record whether the VAT is fully recoverable, partly recoverable or blocked. Registration is required once taxable turnover passes £90,000 in any rolling 12-month period, a threshold unchanged since April 2024.
Two blank formulas drive the tab:
recoverable VAT in GBP = VAT charged x recoverability percentage
irrecoverable VAT in GBP = VAT charged minus recoverable VAT
HMRC's VAT record guidance explains the purchase-invoice evidence used by VAT-registered businesses. Put gross cash, recoverable VAT and net economic cost in separate fields. A qualified tax reviewer must approve the actual treatment.
The Labour tab holds one row per person per task. Its blank header row:
| task | role | worker reference | contract type | planned hours | approved hours | actual hours | loaded GBP rate | rate period | employer costs included | output units | approver |
|---|---|---|---|---|---|---|---|---|---|---|---|
For staff work, enter the task, hours, approved loaded GBP rate, rate period and employer costs. Employer National Insurance has been 15% since 6 April 2025, with the secondary threshold at £5,000 a year.
GOV.UK says eligible staff may create workplace pension contribution duties; use current employer pension guidance for the actual worker. The auto-enrolment minimum employer contribution is 3% of qualifying earnings.
For contractors, HMRC's employment-status tool guidance requires facts about the contract, responsibilities, control and payment; do not assume status from an invoice or job title.
Scenario and control tabs
Keep downside, working and upside cases as editorial planning scenarios without assigned probabilities unless evidence supports them. Vary one traceable input at a time: utilisation, an extra licence or a repair. Delay, a failed output or an exit date also qualify. Do not alter both numerator and denominator without showing both changes.
Scenarios tab, blank header row:
| case | changed input | old value | new value | effect on cash | effect on unit cost | evidence |
|---|---|---|---|---|---|---|
Control gates tab, blank header row:
| gate | owner | evidence required | status | date cleared | tolerance | reforecast trigger |
|---|---|---|---|---|---|---|
Add non-compensating gates for work-equipment safety, access and data. Security, rights, contract and finance need their own gates. HSE's PUWER overview helps define the equipment evidence and training owner. The NCSC's small-organisation backup guidance supports a funded restore test rather than an untested backup line.
Totals and approval
Use blank formulas:
total committed cash in GBP = sum of signed payment obligations in the period
full economic cost in GBP = non-recoverable cash + approved labour + overhead allocation + risk and exit allowances
GBP per accepted unit = full economic cost divided by accepted in-scope units
Totals and approval tab, blank header row:
| committed cash | full economic cost | GBP per accepted unit | variance | remaining contingency | unresolved evidence | sign-off |
|---|---|---|---|---|---|---|
Add two variance formulas without prefilled amounts:
cash variance in GBP = actual cash paid minus authorised cash budget
unit-cost variance in GBP = actual GBP per accepted unit minus approved GBP per accepted unit
Show whether a variance comes from price, quantity, timing, rejected work or a changed denominator. The budget owner should not offset an overspend with an unverified benefit. Record the evidence date and corrective action beside the variance.
The approval page should show variance against the authorised ceiling, remaining contingency, unresolved evidence and each specialist decision. Pause when tolerance is breached, a quotation expires or a mandatory gate is unresolved. Preserve the last approved version, rollback route and restart authority.
Before you act
- Define one production workflow and acceptance unit first
- Give the workbook an owner, version, ceiling and review date
- Attach dated evidence to every value, including zeros
- Split gross cash, recoverable VAT and net economic cost
- Record evidence date and corrective action beside each variance
- Preserve the last approved version and rollback route
- Name a tab owner for VAT, labour and control gates
Common questions
What evidence must support each value in the template?
Every value stays blank until it has a dated invoice, quotation, payroll record, contract or approved scenario source. A zero requires evidence or an explicit assumption, and it must not mean forgotten. Store evidence outside the public draft if it contains personal or commercially sensitive data.
How should VAT be handled in the cost register?
Put gross cash, recoverable VAT and net economic cost in separate fields, and state whether the GBP basis includes or excludes VAT with recoverability. HMRC's VAT record guidance explains the purchase-invoice evidence used by VAT-registered businesses. A qualified tax reviewer must approve the actual treatment.
When should the budget be paused?
Pause when tolerance is breached, a quotation expires or a mandatory gate is unresolved. Add non-compensating gates for work-equipment safety, access, data and security. Rights, contract and finance need gates too. The budget owner should not offset an overspend with an unverified benefit, and the approval page should show unresolved evidence.